This Monday, Manuel Calvo and Martín Llaryora supervised the high-level work on Av. Armada Argentina, at the height of the Villa El Libertador CPC, and later went to the Av. Rancagua sector where an expansion of the distributor with Av. ring road

The tour began at the intersection of Armada Argentina Avenue (urban area of ​​Route 5) and Defensa and Lago Argentino streets, at the height of the Villa El Libertador CPC. There, the continuity of the Córdoba-Alta Gracia Highway is projected through a crossing at a different level, to raise the roads of Armada Argentina and thus resolve through traffic.

In addition, a roundabout will be built at the level, to respond to turning movements, and a connection with the exit branch of the Circunvalación. The construction of a link is also planned through a direct branch for the exit of the external ring of the Circunvalación towards Route 5 Autovía Córdoba – Alta Gracia.

With an investment of 1,709 million pesos, the works have registered an advance of 35 percent and its completion is scheduled for the first months of next year.

Manuel Calvo and Martín Llaryora toured construction sites in the city of Córdoba • Channel C